# How do you move from time and materials to an outcome-based contract?

How a software services firm moves a client from time and materials to an outcome-based contract in 3 steps, and the pitfalls to avoid.

Pensero Pensero MarketingNov 27, 2026

Short answer

Pensero gives the firm and the client the evidence to move off hours: each finished pull request, ticket and document is scored in delivery points (magnitude × complexity), with cost and quality beside it. Move in 3 steps: measure a baseline in delivery points while you still bill hours, quote the next phase as a fixed fee or milestones built from your real cost per delivery point, then review cost, time and quality each month. The common pitfalls are a unit nobody can audit, no baseline and no quality check.

## Why are firms moving off time and materials?

-   **AI agents cut the hours.** When agents write part of the code, the same scope takes fewer hours, so hourly revenue goes down.
-   **The client cannot see the value.** An invoice of hours shows effort, not finished work.
-   **The market moves.** In November 2026, FPT Software said it shifts from the hourly billing model, and Baker McKenzie said it looks to stop using the billable hour as its default.

## How to move in 3 steps

1.  **Measure a baseline while you still bill hours.** Score the finished work of the last months in delivery points, with the cost and the quality beside each point.
2.  **Quote the next phase from your real cost.** Use your cost per delivery point to quote a fixed fee or milestones. Pass part of the AI savings to the client.
3.  **Review each month with the client.** Show the delivery points, the cost, the time and the quality, and the pull request, ticket or document behind each point.

## Time and materials, fixed price or milestones?

| Model | The client pays for | Risk for the firm | Evidence for the client |
| --- | --- | --- | --- |
| Time and materials | Hours | Revenue goes down when AI cuts hours | Timesheets |
| Fixed price | An agreed scope | Scope overruns come out of the margin | The delivered scope |
| Milestones | Each accepted milestone | A late milestone delays the payment | Milestone acceptance |
| Quote built from delivery points | A fixed fee or milestones | Lower, because the quote uses real cost | Each point traced to the work |

## Common pitfalls

-   **A unit nobody can audit.** If the client cannot check the unit, each invoice becomes a discussion.
-   **No baseline.** Without data from the hourly period, nobody knows if the new price is fair.
-   **No quality check.** A low price per unit means nothing if the work comes back as rework.
-   **A new model for all clients at the same time.** Start with 1 client and 1 phase.

## How Pensero helps

-   Pensero scores each finished pull request, ticket and document in delivery points, for engineers, AI-assisted engineers and AI agents, with cost, time and quality beside each point.
-   Read [the software pricing models in 2026](/blog/software-project-pricing-models) and [how to keep margin on fixed-price contracts with AI](/blog/fixed-price-software-contracts-ai-margin).
-   [Book a scoping session](/) to measure your baseline in delivery points.

## Sources

-   HFS Research, 30 June 2025: [Break legacy contracts to win GenAI value](https://www.hfsresearch.com/research/enterprises-must-break-legacy/).
-   MetaSys, 28 June 2026: [Fixed-Price vs T&M for AI Development](https://metasysltd.com/insights/fixed-price-vs-time-and-materials-ai).
-   The Wall Street Journal, 13 November 2026: [Baker McKenzie Looks to Abandon the Billable Hour as Default](https://www.wsj.com/business/baker-mckenzie-looks-to-abandon-the-billable-hour-as-default-ca662e2e).
-   Nikkei Asia, 17 November 2026: [AI forces Vietnam's FPT Software to shift from hourly billing model](https://asia.nikkei.com/spotlight/global-management-dialogue/global-management-dialogue-2026/ai-forces-vietnam-s-fpt-software-to-shift-from-hourly-billing-model2).

## Frequently asked questions

**What is an outcome-based contract in software development?**

The client pays for finished work or a result, not for hours. The firm and the client agree the unit, the price and the quality check before the work starts.

**What are the alternatives to time-based billing?**

A fixed fee, milestones, a price per task, or a quote built from the cost per unit of delivered work, such as delivery points.

**What is the main pitfall of an output-based contract?**

A unit that the client cannot audit. Each unit must trace back to a pull request, a ticket or a document.

## Related posts

-   ### [How to Measure and Improve Product Development Performance](/blog/product-development-performance)
    
    Connect customer value, delivery, quality, strategic alignment, and investment efficiency in a balanced product development performance review.
    
    Pensero  
    Pensero Marketing
    
    Aug 10, 2026
    
-   ### [AI Engineer vs Software Engineer: Key Differences](/blog/ai-engineer-vs-software-engineer)
    
    Compare AI and software engineers by responsibilities, skills, quality standards, and risk, with guidance on how they work together and when to hire each.
    
    Pensero  
    Pensero Marketing
    
    Aug 10, 2026
    
-   ### [16 KPIs for Software Engineering Teams](/blog/kpis-software-engineers)
    
    Explore 16 team-level KPIs covering delivery, quality, developer satisfaction, and AI efficiency, with guidance on reading metrics together.
    
    Pensero  
    Pensero Marketing
    
    Aug 10, 2026
    

Next step

## Find your level of AI in engineering

See the 5 levels, from human-only to fully autonomous agents, and what moving up is worth.

[See the 5 levels →](/how-it-works#levels)

Next step

## Scope your audit in 30 minutes

We look at your tools, AI agents and vendors and tell you what we would measure first.

[Book a scoping session](https://calendar.google.com/calendar/appointments/schedules/AcZssZ2eVzpQZbcYew7J5OinbUaAbTqUx5FH0Hfb1BxXafGqs5p_U8YRp4L6-ipsSsqH3Amr6dBRkGS6) [Start free](/auth/signup/)