Why do man-hour quotes stop working?
- AI makes hours shrink. The same scope takes fewer hours each quarter, so the firm earns less for better work.
- The client cannot check hours. Nobody can verify an hour, only the work that shipped.
- Estimates are guesses. An hour estimate made before the work starts is often wrong, and the change orders come later.
How do you quote without hours? 5 steps
- Choose one unit of finished work. For example, a delivery point: one unit of finished work, scored after it ships.
- Measure your baseline. Score 3 to 6 months of your past work in that unit. Now you know how many units a team delivers per month, and what each unit cost you.
- Size the new scope. Compare the new scope with similar past work, and give a range of units, not one number.
- Set a price per unit. Start from your cost per unit, add your margin, and pass part of the AI savings to the client.
- Agree how you prove it. Each billed unit links to the pull request or ticket behind it, and the client accepts units each month.
Example: one quote, 3 ways
| Quote type | What the client sees | Who carries the risk | What happens when AI gets faster |
|---|---|---|---|
| Man-hours | Hours × rate | The client | The firm earns less |
| Fixed price | One total for the scope | The firm | The firm keeps the savings, but the client sees no proof |
| Per unit of finished work | A range of units × price per unit | Shared, per accepted unit | The firm keeps margin, and the client sees each unit |
Common mistakes
- Using story points as the unit. The team that bills the points also sets them, so the client cannot trust them.
- Quoting one number. Give a range of units, and bill only the units that the client accepts.
- No baseline. Without your past numbers, the price per unit is a guess too.
How Pensero helps
- Pensero scores every pull request and ticket in delivery points, for engineers, AI-assisted engineers and AI agents, and traces each point to the work behind it.
- Pensero shows the cost per point by client and team, so you can set your price per point from facts.
- Read how IT outsourcing firms win bids by pricing per delivery point, the software pricing models in 2026 and what a delivery point is.
- Book a scoping session to quote your next scope in delivery points.
Sources
- HFS Research, 30 June 2025: Break legacy contracts to win GenAI value. On average, 30% of the 2024 GenAI engagements of the service providers that HFS studied include outcome, consumption or risk-sharing components.
- MetaSys, 28 June 2026: Fixed-Price vs T&M for AI Development.
- The Wall Street Journal, 13 November 2026: Baker McKenzie Looks to Abandon the Billable Hour as Default.
Frequently asked questions
How do I quote a software project without man-hours?
Agree on one unit of finished work, measure your past delivery in that unit, and price the new scope per unit.
What can I use instead of hours in a quote?
A unit of finished work, such as a delivery point, with a price per unit.
Is a quote per unit the same as a fixed price?
No. A fixed price is one total. A quote per unit gives a range of units, and the client pays only for the units it accepts.
Can I use story points to quote?
Not for pricing. Story points are estimates that each team sets, so they cannot compare vendors or prove delivery.